Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.8436890
- Product Categories
- Friendly Links
- home > Supply > Supply road steel corrugated pipe culvert _ corrugated metal culvert model, corrugated culvert Specifications [supply the country]
Supply road steel corrugated pipe culvert _ corrugated metal culvert model, corrugated culvert Specifications [supply the country]
Information Name: | Supply road steel corrugated pipe culvert _ corrugated metal culvert model, corrugated culvert Specifications [supply the country] |
Published: | 2012-07-21 |
Validity: | 30 |
Specifications: | Conventional |
Quantity: | 1000000.00 |
Price Description: | |
Detailed Product Description: | Ms. Yang :0318-5,229,383 / 15,343,186,906 QQ: 1786282084. Hebei good times and new materials Engineering Co., Ltd. specializing in the production, sales and installation of all kinds of high-quality corrugated metal culvert pipe, corrugated metal pipe culvert, metal culverts, corrugated metal pipe culverts, steel corrugated pipe culverts, corrugated pipe culverts, TECCO grille, SNS flexible protection system, SNS slope protection, SNS Active safety net, the SNS passive safety net, SNS flexible protection system, ROCCO ring network. Good quality, low price, home installation. Intentionally want information, please contact Ms. Yang :0318-5,229,383 / 15,343,186,906 QQ: 1,786,282,084 Corrugated metal pipe culvert layout 1, oblique hole processing When culverts and line bias, the hole construction of various forms and orthogonal basically the same. Handled in two ways depending on the hole body's constructor: Bias inclined to do (1) (Figure 4-a, b) For the sake of a beautiful shape and adapt to water conditions, to enable the culvert hole body end of the line parallel to such a practice known as bias inclined to do. Cover culvert and box culvert, the use of the practice is widespread bias ramp. In this case, in addition to the holes goods outside the building, also the two ends of the culvert itself be designed prefabricated to fit the needs of the hypotenuse. (2) the bias is to do (Figure 4-c, d) Pipe culvert in order to avoid the construction difficulties of both ends of the tube, can be bias practice for the hole. Bypass the body part and orthogonal exactly the same hole in the side wall height to be adjusted, usually the side wall is designed as a slope-shaped or stepped. Smooth flow of water should be with the embankment slope to the hole building be designed. When the bias culvert with a flat head hole, and 1.30 units, while paving the slope of the berm outside its outstanding roadbed be reinforced |
Admin>>>
You are the 21302 visitor
Copyright © GuangDong ICP No. 10089450, Hebei times Jiaxin Materials Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 21302 visitor
Copyright © GuangDong ICP No. 10089450, Hebei times Jiaxin Materials Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility